Awarded to the party submitting the lowest quote for the first two items of services found in the Town's Request for Quotes. This was Greenman-Pedersen, Inc. (GPI). GPI’s quote for this work was $21,550.00.
For the area from the end of Bradford Road, Natick to where the proposed new trail would end, delineate and survey existing conditions including topography and natural resource area such as wetlands and stream systems.
Include the proposed path in the final drawings- see attached map in red.
Include cross section of banks on either side of the proposed water crossing.
Provide raw data and GIS layering files for future use
Natick GIS base map with 1 foot contour data available for use
10,050 dollars and 00 cents
Separately costed item: Bradford Road Crossing: Prepare a cost effective design and construction cost estimate for the Bradford Road bridge crossing of approximately 30 feet appropriate for the conditions. The bridge should be ADA compliant with all applicable state regulations. Bridge location shown in orange on attached map.
11,500 dollars and 00 cents